India’s rooftop solar market is growing rapidly with the country adding more capacity in the past 12 months than all previous years put together (refer). However, grid interconnection regulations and processes remain challenging in most parts of the country despite almost all states announcing net- and/or gross-metering policies for rooftop solar.

  • Our survey of industry participants shows that overall implementation of net metering policy remains patchy across the country;
  • The policy framework needs an urgent overhaul to make it more consumer friendly and to make it suitable for evolving technologies and business models;
  • International examples show that effective net-metering implementation can increase rooftop solar adoption by as much as 50%;

Slow progress on net metering policy front can be attributed largely to – i) an inadequate policy framework, ii) passive opposition from DISCOMs, and iii) lack of appropriate training and process protocols at the local utility level.

To judge implementation status of net-metering in key states, we conducted a survey of 15 industry professionals and asked them to rate states on parameters such as – average time taken for connection, process transparency and clarity, DISCOM support and competence, meter availability and support for different business models. Delhi, Telangana, Andhra Pradesh, Karnataka and Rajasthan emerged as top states followed by Gujarat, Haryana, Punjab, Chhattisgarh and Kerala (refer). Most installers rated their experiences in Maharashtra, Tamil Nadu, Uttar Pradesh, Bihar, Jharkhand, Odisha and West Bengal as poor. Average time taken for connection is high as 90-100 days in states such as Haryana and Uttar Pradesh. The results show that overall implementation remains patchy across the country and even within the same states, installers have varying experiences presumably because of different policy interpretation by local implementation authorities.

Interestingly, we observe that contrary to expectations, implementation is not improving with more experience or years of policy in operation. Rather it is the efficacy of policy design which seems to have principal influence on on-the-ground implementation. Most net metering policies in India are based on the guiding regulations issued by Central Electricity Regulatory Commission (CERC) in 2013. In our view, these are too restrictive and need an urgent overhaul to relax constraints on system size, type of connections, consumer categories and business models. Moreover, learning from industry experience and best practices adopted by other countries or even some progressive states should be used to help improve the policy framework.

Fundamental drivers for rooftop solar are becoming more compelling by the day and the government has shown a very strong desire to drive growth in this sector. It is already offering a generous mix of capital subsidies, tax incentives and cheaper debt financing schemes for the sector. The government is also substantially ramping up demand in the public sector. All these efforts will fail to produce the desired results unless net-metering policy framework is urgently reformed. International examples show that effective net-metering implementation can increase rooftop solar adoption by as much as 50%.

4 comments

  • No proper training is given to the concerned staff at the electricity board, who are supposed to be in the helm of affairs.

    When I interacted with the concerned, it was told that they do not have time to send them for training to understand the subject and formalities (it is observed that they do have lot of time to while away elsewhere).

  • We do have a good policy, but execution at the ground level has been a challenge.
    – The awareness and the intent to execute at the authorities or individual involved in the approval process lack motivation. Of the other priorities which they are involved on a day to day basis, this is a deviation of their efforts. How do we improve their awareness and incentivize them to realize solar Rooftop project is key.

    – Also the policy changes and framework does not enable them to learn or improve their understanding. They delay the projects and wait for empowerment or clarity.